The Town of Thompson in Sullivan County, NY hired Delaware Engineering in 2018 to prepare an Infrastructure Master Plan. Due to scattered development patterns and a growing seasonal population, the Town’s water and sewer infrastructure was disparate and challenging to manage from both an administrative as well as capital, operations, and maintenance perspective. Numerous special improvement districts (water and sewer) had been created over the years. At the time of creation, each of these districts had a purpose; however, over time, the function and finances of the districts had changed.
Town officials wanted to explore if water and sewer rates should be restructured to be more fair and equitable and/or if district consolidation should be considered. At the time, the Town was also considering several capital improvement projects, and the debt service associated with such projects would have a substantial impact on future rates.
The scope of work included a comprehensive review of existing water and sewer infrastructure, analysis of fiscal conditions, conceptual project development and preliminary cost estimating, prioritization of projects, and review of districts and rate structures.
Major recommendations in the plan (completed in 2019) included consolidating nine sewer districts into three based on a common user base, and standardizing the method of billing to be based on the type of use rather than assessed value. In addition, the master plan enabled the Town to qualify for hardship financing from NYSEFC for major upgrades to two wastewater treatment plants – Kiamesha Lake and Emerald Green. Both projects are currently in the final design phase.
Featured image: Town of Thompson Land Use Zoning Map, 2017
More images of this project
Infrastructure Master Plan - Town of Thompson
Site Visit to Kiamesha WWTP
Infrastructure Master Plan - Town of Thompson