Delaware Engineering provided planning, design, construction administration services for the new 7,900 square foot (52’ x 152’) highway garage to replace the facility lost to fire in January 2005. The new 6-bay , pre-engineered Butler building includes 9 overhead doors, propane-fueled hydronic radiant floor heating system, Superintendent’s office, break/meeting room, men’s and women’s bathrooms and a mechanical room. Engineering began in April 2005 and the Town took occupancy of the building in November 2005. The cost for construction by two prime construction contractors (general and electrical), engineering and site surveying equaled $700,000.