Town of Prattsville

Prattsville Bank Stabilization

Overall Cost
$148,824.00

Delaware Engineering assisted the Greene County Soil and Water Conservation District to repair an eroding bank of the Schoharie Creek that ran along a farm field.  The project included approximately 1240 feet of stream bank stabilization. The bank stabilization work consisted of installing large rock at the bottom of the bank, creating a high water bench and grading the upper bank to a 3:1 slope.  Riparian vegetation was planted on the high water bench and upper bank along the full length of the restoration.

See More Stormwater Projects