The City of Hudson owns and operates a Wastewater Treatment Plant (WWTP) and a collection system that conveys wastewater generated by the City to the WWTP. Approximately 70% of the City’s piping for conveying wastewater also collects stormwater in a combined sewer system(CSS) and is 60% is older vitrified clay or masonry pipe. The City’s ongoing endeavor to characterize and develop realistic long-term strategies to reduce and ideally eliminate stormwater overflows of partially treated sewage into the Hudson River has generated valuable data.
In 2021, Delaware Engineering was contracted to expand on the previous work and deliver a preliminary engineering report (PER).
Delaware evaluated the City’s entire collection system as a Long-term Combined Sewer Overflow (CSO) Mitigation Project. The investigation included mapping and hydraulic modeling of existing systems. Delaware utilized video and/or smoke testing to pinpoint locations of infiltration and inflow (I&I). Field inspections were conducted to identify critical components of the system, and determine options for further separation of stormwater from sanitary flow.
The PER will is providing the City with guiding information to inform long-term planning.
Delaware assisted the City of Hudson in securing a $100,000 Engineering Planning Grant (EPG) for the CSO Study. Based on the findings of the study and subsequent engineering report, along with the City, Delaware was successful in procuring additional grant funding to support the Long-term Combined Sewer Overflow Mitigation project: $1.4 million WQIP grant for CSO remediation and a $25 million BIL-GS grant for long-term CSO mitigations.
More pictures from this project:
City of Hudson Sanitary Sewer Evaluation
Field Inspection Map
City of Hudson Sanitary Sewer Evaluation
Old piping and manholes dating back as far as the 1870's
City of Hudson Sanitary Sewer Evaluation
CCTV capture of leaks in vitrified clay pipe
City of Hudson Sanitary Sewer Evaluation
Aged CSO outfall pipe collapse causing a sink hole (2019)